

SERVICES
Installation & Removal
​
-
Multi-site installations
​
-
Review layout, requirements and delivery schedules
​
-
Uninstall old racks, batteries and power equipment
​
-
Dispose of sent batteries according to EPA requirements
​
-
Verify and stage incoming system components
​
-
Build and install battery and power shifting racking
​
-
Spill containment
​
-
Complete installation records in accordance with IEEE Standard 484
​
-
Disposal of all packing and installation debris
​
-
Battery monitor installation
Capacity Testing
​
-
According to IEEE standards, capacity testing should be performed within two years of installation
​
-
Wet batteries should be tested every five years thereafter
​
-
Valve regulated lead acid (VRLA) batteries should be tested annually
​
-
Once battery capacity dips below 85% of the manufacturer's rating, replacement should be considered
​
-
Our expertly trained technicians can perform all necessary capacity testing as well as monitor individual cell voltage and connection resistance
​
-
If corrective actions are required, we can provide them

Capacity Testing
See how we test
Battery Maintenance
​
VLA Batteries
​
VRLA Batteries
​
Ni-Cd Batteries​
​
Monthly
​
Quarterly​
​
Bi-Annually
​
Annually
​
​
​All programs are catered to customer specifications. We follow all IEEE, NERC and manufacture recommendations, providing the right coverage to ensure that product is properly maintained for optimum performance.

Maintenance
For battery
longevity


